Brimscombe Port Mill

Closed Loop Water Source Heat Pump
Services installed:
Renewable Technology
At a glance
2020

Completion

£21,077

Lifetime savings

1074 Tonnes

Carbon saved

*Projected over a 20-year lifespan based on installation costs and energy prices at the time of installation.

The property

Brimscombe Port is a listed heritage building belonging to Stroud District Council which had ageing natural gas boilers and traditional radiator infrastructure to provide space heating and hot water for the building’s occupants.

Fortunately, the building benefits from being located next to a natural water source, the River Frome, which is directly adjacent to the building.

Our approach

Cotswold Energy Group put forward a design & build proposal to extract heat from the river via a closed loop water source heat pump system to entirely replace the gas boilers and provide heating and hot water. The project also enabled the council to make considerable running cost savings whilst delivering significant carbon reductions.

The results

3 x 60kW NIBE heat pumps and 750L thermal store were installed to cover the building’s demand, these units were fed by custom built river collectors designed and built by local project partner Renewables First.

New radiators were installed throughout the building along with minor pipework modifications to support the enhanced flow rates.

Related services

Leading the way in renewables for business
We will help your business apply for a renewable energy grant
A detailed feasibility study tailored to your business and decarbonisation goals
Take control of your energy with commercial solar panels for your business

Related solutions